Bathroom Remodel
- Date: Oct 2018
About this Project
Took out the corner tub, removed the vinyl flooring. Took out the shower and half wall.
Repaied the drywall, laid new laminate wood flooring. Installed new shower pan, Tiled shower with shower Niches, and installed glass shower. Installed new vanity and fixtures


Before




After




